Lean Manufacturing Six Sigma Forum
Bienvenido. Welcome. Bienvenu.

TU EXPERIENCIA EN EL FORO SE MAXIMIZA CON TU INSCRIPCIÓN GRATIS
Últimos temas
» More about R squared. Excellent plain English explanation
Vie Abr 14, 2017 7:50 am por wsterlin

» Dynamic Threshold Efficiency
Sáb Feb 11, 2017 7:52 am por wsterlin

» Transform your FMEA into a risk matrix for ISO 9001:2015
Vie Ene 06, 2017 7:40 am por Admin

» Quantum TC Six Sigma Black Belt book of Knowledge
Sáb Dic 24, 2016 7:52 am por Admin

» Quantum TC Green belt Book of Knowledge
Sáb Dic 24, 2016 7:39 am por Admin

» Criterios de evaluación de proyectos por nuestro jurado
Vie Dic 23, 2016 6:08 am por Admin

» Certificación On-Line: eLearning.
Vie Dic 23, 2016 6:01 am por Admin

» Understanding the typical 1.5 sigma shift in a process.
Dom Dic 04, 2016 8:23 am por wsterlin

» Sobre análisis de regresión
Lun Oct 10, 2016 12:01 am por wsterlin

» Lean Transformation Equation
Jue Sep 01, 2016 10:31 pm por Admin

DataFeast By Quantum TC
Galería


Sondeo

Usted encontró lo que buscaba

 
 
 

Ver los resultados


Programa de certificación Lean Manufacturing Nivel Bronce

Ver el tema anterior Ver el tema siguiente Ir abajo

Programa de certificación Lean Manufacturing Nivel Bronce

Mensaje  Admin el Mar Jul 22, 2014 7:16 am

CURRICULUM- LEAN HAMPION CERTIFICACIÓN NIVEL BRONCE  


Module 1: DIAGNOSIS   (total 32 horas)

A. ntroducci n a Lean Manufacturing: Gemba, Gembutsu, Genjitsu. 5W+1H. Lean profile.
B. Evaluaci n de las 11 llaves (11 key assessment)
C. Evaluaci n de los 8 desperdicios (8 waste assessment)
D. Muda, Mura, Muri
E. Takt time and pitch time
F. People flow concept: Diagrama espagueti (spaguetti diagram)
G. Grafica de carga y Yamazumi
H. Mapa de flujo de valor estado actual (current state Value Stream Mapping VSM)
I. MAK GAM  estado actual
J. Manufacturing Critical-path Time
K. Matriz de habilidades (skills Matrix). Shojinka. Stotinka.

Module 2:  STABILITY (total 36 horas)

A. Eventos Kaizen: Kaizen, Kaikaku, Teian. Focus improvement team
B. 5S + 1
C. Control Visual: Andon, Marcado de pisos, Oasis. Mieruka.
D. Process Mapping: deal state S POC, Process Flowchart, Coded Process mapping  
E. FMEA (Failure Mode effect Analysis)
F. Standard Work: Process Capacity Table, Standard work layout, Standard work combination sheet,
Standard work instruction, etc.
G. Line Balancing. Baton Pass (mutual assistance technique). POU (point of use). Water Spider.
H. Standard work in process (SW P) and Standard in-Process stock (S PS).
I. Poka Yoke. Jidoka.
. Kanban and Pull System. Heijunka.

Module 3: STRATEGY (total 4 horas)

A. Mapa de flujo de valor estado futuro. (future State Value stream mapping VSM)

Module 4: ACTIONS (total 23 horas)

A. Manufacturing cell design.
B. Continuous flow. One Piece flow. One piece flow class simulations: ej: shirt line assembly.
C. Quick Changeover: Single Minute exchange of Die (SMED)
D. A3

Module 5: EVALUATION (total 1 hour)

A. Reuse de algunas herramientas de la fase de diagnostic para evaluar el progreso y definer la
nueva ruta.

Descargar archivo en:
Programa acreditado de certificación Lean Manufacturing nivel bronce

_________________
Administrador del Foro
Quantum TC
Dominican Republic
avatar
Admin
Admin

Mensajes : 105
Puntos : 308
Fecha de inscripción : 30/12/2010

Ver perfil de usuario http://qtclean.forosactivos.net

Volver arriba Ir abajo

Ver el tema anterior Ver el tema siguiente Volver arriba

- Temas similares

 
Permisos de este foro:
No puedes responder a temas en este foro.