Lean Manufacturing Six Sigma Forum
Bienvenido. Welcome. Bienvenu.

TU EXPERIENCIA EN EL FORO SE MAXIMIZA CON TU INSCRIPCIÓN GRATIS
Últimos temas
» More about R squared. Excellent plain English explanation
Vie Abr 14, 2017 7:50 am por wsterlin

» Dynamic Threshold Efficiency
Sáb Feb 11, 2017 7:52 am por wsterlin

» Transform your FMEA into a risk matrix for ISO 9001:2015
Vie Ene 06, 2017 7:40 am por Admin

» Quantum TC Six Sigma Black Belt book of Knowledge
Sáb Dic 24, 2016 7:52 am por Admin

» Quantum TC Green belt Book of Knowledge
Sáb Dic 24, 2016 7:39 am por Admin

» Criterios de evaluación de proyectos por nuestro jurado
Vie Dic 23, 2016 6:08 am por Admin

» Certificación On-Line: eLearning.
Vie Dic 23, 2016 6:01 am por Admin

» Understanding the typical 1.5 sigma shift in a process.
Dom Dic 04, 2016 8:23 am por wsterlin

» Sobre análisis de regresión
Lun Oct 10, 2016 12:01 am por wsterlin

» Lean Transformation Equation
Jue Sep 01, 2016 10:31 pm por Admin

DataFeast By Quantum TC
Galería


Sondeo

Usted encontró lo que buscaba

 
 
 

Ver los resultados


Programa de certificación Lean Manufacturing Nivel Plata

Ver el tema anterior Ver el tema siguiente Ir abajo

Programa de certificación Lean Manufacturing Nivel Plata

Mensaje  Admin el Miér Jul 23, 2014 11:40 am

CURRICULUM- LEAN MASTER CERTIFICACIÓN NIVEL PLATA. Programa acreditado


Module 1: DIAGNOSIS   (total 36 horas)

A. Introducción a Lean Manufacturing: Gemba, Gembutsu, Genjitsu. 5W+1H. Lean profile.
B. Evaluación de las 11 llaves (11 key assessment)
C. EValuación de los 8 desperdicios (8 waste assessment)
D. Muda, Mura, Muri
E. Takt time and pitch time
F. People flow concept: Diagrama espaguetti (spaguetti diagram)
G. Grafica de carga y Yamazumi
H. Mapa de flujo de valor estado actual (current state Value Stream Mapping VSM)
I. Makigami estado actual
J. Manufacturing critical-path time: MCT
K. Matriz de Habilidades (skills matrix). Shojinka. Stotinka.
L. Lean Culture assessment

Module 2:  STABILITY (total 52 horas)

A. Eventos Kaizen: Kaizen, Kaikaku, Teian. Focus improvement team
B. 5S + 1
C. Control Visual: Andon, Marcado de pisos, Oasis. Mieruka.
D. Kata mporvement and Kata Management.
E. Process Mapping: deal state S POC, Process Flowchart, Coded Process mapping  
F. FMEA (Failure Mode effect Analysis)
G. Standard Work: Process Capacity Table, Standard work layour, Standard work combination sheet,
Standard work instruction, etc.
H. Line Balancing. Baton Pass (mutual assistance technique). POU (point of use). Water Spider.
I. Standar work in process (SW P) and Standard in-Process stock (S PS).
J. Poka Yoke. Jidoka.
K. Kanban and Pull System. Heijunka
L. Quick Response Manufacturing and Polca
M. Diseño y selección de KP s
N. TW : Training within ndustry

Module 3: STRATEGY (total 20 horas)

A. Mapa de flujo de valor estado futuro. (future State Value stream mapping VSM)
B. Lean as a strategy. Hoshin Kanri. Strategic lean or Voice of the process. Nemawashi. Hansei.
C. SLP: Systematic Layout Planning

Module 4: ACTIONS (total 40 horas)

A. Manufacturing cell design.
B. Continuous flow. One Piece flow. One piece flow class simulations: ej: shirt line assembly.
C. Quick Changeover: Single Minute exchange of Die (SMED)
D. A3
E. Kamishibai
F. Gemba Walk. Process confirmation table
G. TPM (Total Productive Maintenance). Los 8 pilares y todas sus herramientas y copnceptos.

Module 5: EVALUATION (total 12 horas)

A. 14 Lean points assessment
B. Lean Process Business Strategy evaluation
C. Tecnicas basicas de benchmarking
D. Introduccion to Estadisticas basicas para analisis de datos en lean.

Descargar archivo en:
Programa de certificación Lean Manufacturing Plata

_________________
Administrador del Foro
Quantum TC
Dominican Republic
avatar
Admin
Admin

Mensajes : 105
Puntos : 308
Fecha de inscripción : 30/12/2010

Ver perfil de usuario http://qtclean.forosactivos.net

Volver arriba Ir abajo

Ver el tema anterior Ver el tema siguiente Volver arriba

- Temas similares

 
Permisos de este foro:
No puedes responder a temas en este foro.