CURRICULUM- LEAN MASTER CERTIFICACIÓN NIVEL PLATA. Programa acreditado
Module 1: DIAGNOSIS (total 36 horas)
A. Introducción a Lean Manufacturing: Gemba, Gembutsu, Genjitsu. 5W+1H. Lean profile.
B. Evaluación de las 11 llaves (11 key assessment)
C. EValuación de los 8 desperdicios (8 waste assessment)
D. Muda, Mura, Muri
E. Takt time and pitch time
F. People flow concept: Diagrama espaguetti (spaguetti diagram)
G. Grafica de carga y Yamazumi
H. Mapa de flujo de valor estado actual (current state Value Stream Mapping VSM)
I. Makigami estado actual
J. Manufacturing critical-path time: MCT
K. Matriz de Habilidades (skills matrix). Shojinka. Stotinka.
L. Lean Culture assessment
Module 2: STABILITY (total 52 horas)
A. Eventos Kaizen: Kaizen, Kaikaku, Teian. Focus improvement team
B. 5S + 1
C. Control Visual: Andon, Marcado de pisos, Oasis. Mieruka.
D. Kata mporvement and Kata Management.
E. Process Mapping: deal state S POC, Process Flowchart, Coded Process mapping
F. FMEA (Failure Mode effect Analysis)
G. Standard Work: Process Capacity Table, Standard work layour, Standard work combination sheet,
Standard work instruction, etc.
H. Line Balancing. Baton Pass (mutual assistance technique). POU (point of use). Water Spider.
I. Standar work in process (SW P) and Standard in-Process stock (S PS).
J. Poka Yoke. Jidoka.
K. Kanban and Pull System. Heijunka
L. Quick Response Manufacturing and Polca
M. Diseño y selección de KP s
N. TW : Training within ndustry
Module 3: STRATEGY (total 20 horas)
A. Mapa de flujo de valor estado futuro. (future State Value stream mapping VSM)
B. Lean as a strategy. Hoshin Kanri. Strategic lean or Voice of the process. Nemawashi. Hansei.
C. SLP: Systematic Layout Planning
Module 4: ACTIONS (total 40 horas)
A. Manufacturing cell design.
B. Continuous flow. One Piece flow. One piece flow class simulations: ej: shirt line assembly.
C. Quick Changeover: Single Minute exchange of Die (SMED)
D. A3
E. Kamishibai
F. Gemba Walk. Process confirmation table
G. TPM (Total Productive Maintenance). Los 8 pilares y todas sus herramientas y copnceptos.
Module 5: EVALUATION (total 12 horas)
A. 14 Lean points assessment
B. Lean Process Business Strategy evaluation
C. Tecnicas basicas de benchmarking
D. Introduccion to Estadisticas basicas para analisis de datos en lean.
Descargar archivo en:
Programa de certificación Lean Manufacturing Plata
Module 1: DIAGNOSIS (total 36 horas)
A. Introducción a Lean Manufacturing: Gemba, Gembutsu, Genjitsu. 5W+1H. Lean profile.
B. Evaluación de las 11 llaves (11 key assessment)
C. EValuación de los 8 desperdicios (8 waste assessment)
D. Muda, Mura, Muri
E. Takt time and pitch time
F. People flow concept: Diagrama espaguetti (spaguetti diagram)
G. Grafica de carga y Yamazumi
H. Mapa de flujo de valor estado actual (current state Value Stream Mapping VSM)
I. Makigami estado actual
J. Manufacturing critical-path time: MCT
K. Matriz de Habilidades (skills matrix). Shojinka. Stotinka.
L. Lean Culture assessment
Module 2: STABILITY (total 52 horas)
A. Eventos Kaizen: Kaizen, Kaikaku, Teian. Focus improvement team
B. 5S + 1
C. Control Visual: Andon, Marcado de pisos, Oasis. Mieruka.
D. Kata mporvement and Kata Management.
E. Process Mapping: deal state S POC, Process Flowchart, Coded Process mapping
F. FMEA (Failure Mode effect Analysis)
G. Standard Work: Process Capacity Table, Standard work layour, Standard work combination sheet,
Standard work instruction, etc.
H. Line Balancing. Baton Pass (mutual assistance technique). POU (point of use). Water Spider.
I. Standar work in process (SW P) and Standard in-Process stock (S PS).
J. Poka Yoke. Jidoka.
K. Kanban and Pull System. Heijunka
L. Quick Response Manufacturing and Polca
M. Diseño y selección de KP s
N. TW : Training within ndustry
Module 3: STRATEGY (total 20 horas)
A. Mapa de flujo de valor estado futuro. (future State Value stream mapping VSM)
B. Lean as a strategy. Hoshin Kanri. Strategic lean or Voice of the process. Nemawashi. Hansei.
C. SLP: Systematic Layout Planning
Module 4: ACTIONS (total 40 horas)
A. Manufacturing cell design.
B. Continuous flow. One Piece flow. One piece flow class simulations: ej: shirt line assembly.
C. Quick Changeover: Single Minute exchange of Die (SMED)
D. A3
E. Kamishibai
F. Gemba Walk. Process confirmation table
G. TPM (Total Productive Maintenance). Los 8 pilares y todas sus herramientas y copnceptos.
Module 5: EVALUATION (total 12 horas)
A. 14 Lean points assessment
B. Lean Process Business Strategy evaluation
C. Tecnicas basicas de benchmarking
D. Introduccion to Estadisticas basicas para analisis de datos en lean.
Descargar archivo en:
Programa de certificación Lean Manufacturing Plata
Sáb Ago 05, 2023 2:41 pm por Admin
» Integración SMED y YAMAZUMI
Sáb Mayo 27, 2023 4:28 pm por wsterlin
» OEE (paradas menores) y Takt time
Lun Oct 10, 2022 1:49 pm por wsterlin
» Six Sigma concepts into Lean 8 Wastes
Dom Jul 10, 2022 7:33 pm por Admin
» Términos estadísticos
Miér Jul 06, 2022 8:54 pm por Admin
» Analítica de riesgo
Lun Jun 13, 2022 3:37 pm por Admin
» Cómo funciona en la práctica los cálculos de un Kanban?
Dom Jun 12, 2022 12:32 pm por Admin
» Statistics Based Kaizen
Lun Mar 14, 2022 9:01 am por Admin
» 9 key to Productivity Improvement
Lun Dic 13, 2021 4:04 pm por Admin
» What is Lean Six Sigma?
Dom Nov 28, 2021 10:39 pm por Admin